Project Information

Pyramids Shopping Centre in Birkenhead is the areas premier retail area. The centre hosts over 100 high street retail outlets along with the areas market. The centre spans across a vast area with a varying size and type of roofs and part of the ongoing annual maintenance involves upgrades and refurbishment to the roofs.

Mars Construct Limited were brought in to deliver a number of works to the service walkways and various roof areas. These areas were experiencing a number of issues and were in a general state of disrepair. Westwoods were the specified manufacturer and two solutions were put forward. Firstly for the walkway areas, a PMMA based hard wearing walkway coating was installed. This offers great durability, a non slip finish, rapid cure times and limitless design options. The roof areas were tackled with Westwoods PU system which offers a cost effective durable liquid coating. Applied directly in the main to the existing coverings, this was a great simple solution that offered a leak free roof whilst dramatically improve the aesthetics of the roof with its ice white glossy finish. With over 2500 m2 of coatings installed to our usual high standards, the project was delivered on time to the full satisfaction of the client. 


 

  • Removal and capping of redundant roof penetration and openings
  • Roof integrity upgrades
  • PMMA Liquid walkway coatings installed
  • Spot repairs to existing membrane
  • PU liquid overlay system to roofs
  • Renewal of lead flashings to various areas
  • Repointing to termination details throughout

 


Client Benefits

  • 10 year insuranced backed warranty covering material and workmanship
  • Long lasting durable roof coating 
  • Tennant relations appeased
  • Approved contractor scheme to maintain standards
  • Consistently high quality workmanship
  • Mars high level customer service
  • ​Improved aesthetics and value addition
  • Project delivered on budget, on program and with no disruption

 

Download Case Study

Make an enquiry

Ensure all fields marked with an asterisk (*) are filled out to help us contact you swiftly.

  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  • Health & Safety in Roofing Gold Award - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing
  •  - Mars Construct, Liquid Waterproofing and Car Park Surfacing